§ 42-74. When mandatory.  


Latest version.
  • Each property owner owning a lot or plot of ground in the city on which there is located a house or dwelling occupied or capable of being occupied by human beings, or on which is located a building or structure containing toilet facilities, and which lot or plot of ground is capable of connecting to a city sewer or water line by construction of 200 feet or less of sewer or waterline is hereby required to connect such house or dwelling to such sewer or water lines at their expense within 90 days from the time the sewer or water service is available. Each said property owner is further required to equip such house or dwelling with toilet facilities and keep said toilet facilities connected at all times with the city sewer and water lines and the occupants of the house or dwelling at all times use the sewer and water facilities of the city.

(Code 1990, ch. 10, § 1(E)(1))